Hisense WFQP7012EVM 7kg Washing Machine

£239.00 * Save £10 £249.00 * (4.02% Saved)

Prices incl. VAT excluding shipping costs

Out of stock. Contact us before ordering for a delivery estimate
 
by phone: 01765 607659
 
by email: sales@gcraggs.co.uk
 
by form: gcraggs.co.uk/contact-form
 

  • 2 Year Warranty
  • Durable Inverter Motor
  • Space-Saving Slim Depth
  • 15min Quick Wash
  • HISENS-WFQP7012EVM
  • 850 mm
  • 598 mm
  • 450 mm
Additional Services
Appliance Disposal £10.00
More Info
Freestanding Washer Installation £50.00
More Info
Surcharge for Upstairs Medium Appliance Deliveries £20.00
More Info
Large Disposal £35.00
More Info
Surcharge for Upstairs Large Appliance Deliveries £40.00
More Info

  Overview Hisense's WFQP7012EVM washing machine is a versatile and efficient... more
Product information "Hisense WFQP7012EVM 7kg Washing Machine"

 


Overview

Hisense's WFQP7012EVM washing machine is a versatile and efficient appliance designed to handle all your family’s laundry needs. With a range of 15 programmes, advanced features like steam cleaning, and a space-saving design, this washing machine is perfect for busy households looking for convenience and performance.


Versatile Washing Programmes

This washing machine offers 15 different programmes, including Anti-Allergy, Anti-Bacterial, Cotton, Eco, Synthetic, Mixed Load, Wool, and Babywear. Whether you need a quick wash or a deep clean, there’s a setting to suit every load. The quick wash cycle can clean your clothes in just 15 minutes, making it ideal for those last minute laundry needs.


Advanced Cleaning Features

The steam function provides a thorough deep clean by removing allergens and leaving your clothes soft, reducing the need for fabric softener. This feature also helps to minimise creases, making ironing easier. The digital inverter motor technology ensures optimal drum rotation speed for each load, resulting in less vibration, quieter operation, and lower energy consumption.


User Friendly Design

The WFQP7012EVM features a large 7kg drum, making it suitable for family sized loads. The machine’s slim depth design is perfect for saving space in your home. With dial controls and a time remaining indicator, you can easily manage your laundry. The start delay feature allows you to schedule cycles to start at a convenient time, perfect for taking advantage of off peak energy tariffs.


Energy Efficiency and Performance

This washing machine has an energy efficiency class of C, with an annual energy consumption of 0.59 kWh and water usage of 9240 litres. The spin speed of up to 1200 rpm helps to reduce drying times, and the machine operates at a noise level of 74 dB during spinning. The spin performance class is rated B, ensuring effective water extraction from your laundry.


Safety and Connectivity

Safety features include a child lock to prevent accidental changes to settings and out-of-balance protection to ensure stable operation. The Hisense WFQP7012EVM also offers smart connectivity options, including Bluetooth and Wi-Fi, allowing you to control and monitor your washing machine remotely.


Space-Saving and Durable

The slim depth design of this freestanding washing machine makes it a great space-saving option for any home. Available in classic white, it blends seamlessly with any kitchen. The durable construction and advanced inverter motor technology ensure a long-lasting and reliable performance.


 

Built-In: No
Colour: White
Wash Load Size (kg): 7
Spin Speed (rpm): 1200
Washing Features: 30 Mins or Less Wash, Slim Depth
Eco Features: Eco Wash, Time Delay
Related links to "Hisense WFQP7012EVM 7kg Washing Machine"
Read, write and discuss reviews...More
  Delivery times and schedules may vary, for full details please see the delivery... more
Delivery Information

 

Delivery times and schedules may vary, for full details please see the delivery information section of our website.

If you choose an installation service then the delivery cost is included in that amount. No additional delivery charge is added. If you don't select any installation services our delivery charge for medium domestic appliances and larger TVs in our local area (Zone 1 on the map on the delivery information section of our website) is £20. This is to deliver to you at your ground floor door. Smaller items such as cleaners, microwaves, kettles, etc, are delivered for £10.

G Craggs Installation Service Icon

Installation services have this symbol.

If an item is out of stock for a long period of time we will inform you of an expected delivery date by email. If this is not acceptable we will inform you of an alternative item or you may cancel the order.

Please examine goods upon receipt.

We prefer to unpack products for you to inspect on delivery. If your preference is for them to be left packaged we cannot accept responsibility for damage unless it is reported to us within 48 hours of delivery.

If we have installed a product ensure you are happy before signing the delivery note. Reports of damage to the product or fixtures/fittings will not be entertained after we have left your premises.

Please ask your question about "Hisense WFQP7012EVM" below:
Please enter these characters in the following text field.
The fields marked with * are required.

I have read the data protection information.

Save £20
B
Sustainable Materials
Save £130
A
Save £30
A
Save £20
A
Save £20
A
E
Suitable for Outbuildings
Save £20
Save £30
A
Save £150
5 Year Warranty
Save £50
Save £100
5 Year Warranty
No Articles to Compare